How long does it take?
From the time of signing, it takes 6 months to build and deliver your permitted structure. Lead times depend on local permitting wait times and availability in our production queue. To get an up-to-date estimate for your project, please fill out our project timeline estimate form.
What can affect the timeline?
1.Obtaining Building Permits: Each jurisdiction has different lead times for permitting. Canyon Cabins is equipped to address all state, county, and city permitting requirements, and to file building permits for your project. See more about permitting here.
2.Material Procurement: Material availability from our suppliers might affect the timeline if there are unforeseen supply delays or if a material substitution is necessary.
3.Site Work: During our feasibility analysis, we identify the scope of site work needed and update your timeline accordingly. New conditions discovered during the work or the availability of your local general contractor (GC) can also affect the timeline.
Is building an Canyon Cabin faster than building on-site?
Yes, building in the controlled setting of our workshop by builders deeply experienced in the product expedites the construction by as much as 2x when compared to building on-site or assembling a flat-packed prefab kit. Additionally, workshop fabrication eliminates the unknown factors of on-site construction, such as material and labor shortages, weather or inspection delays. Our modular designs allow us to build the structure efficiently and in tandem with other projects, saving time, reducing material costs, and minimizing waste.